2026-03-31, Tue.

Top Stories       Business       Culture & Life       Science & Technology       World

Lecture

Notification

 

NEWS > Science & Technology


INNIO Secures Additional Major Order from VoltaGrid: 1.5 GW for Behind-the-Meter Power Generation

INNIO and VoltaGrid have signed an agreement to supply 1.5 gigawatts (GW) of behind-the-meter power generation infrastructure, including 300 Jenbacher gas engines.
Date: 2026-03-29


INNIO's Jenbacher J624 gas engine

JENBACH, AUSTRIA & HOUSTON -- INNIO Group announced a major order from VoltaGrid for 1.5 gigawatts (GW), reinforcing the companies’ collaboration in behind‑the‑meter (on-site) power generation for AI and high‑performance computing infrastructure.

Under the agreement, INNIO expects to supply a total of 300 Jenbacher gas engines from its Type J624 and Type J620 series. The J624 series is integrated into VoltaGrid’s proprietary QPac™ platform. The engines are packaged into 25 MW units, enabling rapid, scalable deployment for data center customers across the United States. Delivery is scheduled by 2028.

“This landmark order underscores the strength of INNIO’s technology and our commitment to power the growth of AI,” said Dr. Olaf Berlien, President and CEO of INNIO Group. “We are proud to deepen our collaboration with VoltaGrid as we help shape the evolution of energy infrastructure.”

“This is a major step forward in building the energy backbone for the AI era,” said Nathan Ough, CEO of VoltaGrid. “Together with INNIO, we are delivering a scalable, grid-grade solution that offers fast response and eliminates the need for batteries. Our collaboration provides the speed, reliability, and sustainability required to power next-generation data centers.”

Developed jointly by INNIO and VoltaGrid, the solution is engineered to support data center deployment and Graphics Processing Unit (GPU) utilization for AI-driven workloads. Powered by INNIO’s Jenbacher technology, the integrated platform delivers prime, backup, and peaking power within a single system for operational flexibility. The system maintains full power and efficiency at high ambient temperatures with excellent transient performance capable of managing the highly volatile load fluctuations typical of AI computing environments.

The collaboration enables the integration of VoltaGrid’s power pack units with its large-scale portable data center power systems powered by INNIO technology.



 to the Top List of News

Biocytogen Starts Phase 1 Trial of IDEAYA¡¯s First-in-Class B7H3/PTK7 Bispecific TOP1 ADC IDE034 With First Patient Dosed
Türk Telekom, P.I. Works Partner on AI-Powered 5G Network Slicing at MWC Barcelona
Global PC Shipments to Decline 12% in 2026 Amid Severe Memory and Storage Supply Challenges
AI Is Resetting the Rules of Growth in CPG
SES Brings Satellite Connectivity to Refugees in Chad
INNIO Secures Additional Major Order from VoltaGrid: 1.5 GW for Behind-the-Meter Power Generation
Riskified Announces Expansion of AI Agent Intelligence to Secure Native Merchant AI Shopping Assistants

 

Smartly Adds Amazon DSP to Boost Creative and Campaign Management Acro...
Balmain Beauty Introduces Destin de Balmain: A New Prestige Fragrance
New Lenovo Service Delivers Always-On Infrastructure: Premier Support ...
Transforming Africa¡¯s Future Farmers: Satellite-Enabled IoT Powers Da...
AI: The New Insider Threat Facing Organizations
Cowellnex and Metagen Launch Joint Research Utilizing Independently Ac...
Vestas and Mokpo National Maritime University Sign MOU to Foster Offsh...

 

 

60, Gamasanro 27gil, Guro-gu, Seoul, Korea, e-mail: news@newsji.com

Copyright, NEWSJI NETWORK.

.